• Home
  • Make Reservations
  • Photo Galleries
    • Beehive Cabin
    • Photos 2011
    • Photos 2010
    • Photos 2009
    • Photos 2008
  • Vintage Photos
    • Alma & Leon
    • Leon Shaw's Old Photos
    • Old Times at the Cabin
    • Antique Photos
  • Cabin History

  • Chores
  • Annual Budget
  • Cabin Log
  • Contact

  • Back to the Trail

Chores:

Work Completed 2010 —
• Kym and Chris Duncan opened up the cabin after the winter and fixed some broken water pipes.
• Ron Shaw and family replaced the steps and rebuilt the shower.
• Ron Shaw delivered a cord a wood.
• Extensive plumbing work and pipe replacement.
• Norm Shaw winterized the cabin.

Work Completed 2009 —
• Howard had the tree trimmed over the woodshed.
• We had electrical issues that were addressed.
• Donna helped acquire a new refrigerator and stove.
• Sandi and Ric Twigg installed it.
• Jim and Norm Shaw worked on the stove chimney on the roof.
• Howard’s family painted the Cabin with primer and paint!
• Window putty applied and painted.
• Thompson waterseal on front porch.
• Rebuilt the overhang over the back steps.
• Howard and Craig rebuilt the water valve.
• Howard repacked kitchen and bathroom faucet.
• Craig installed the dock and left two kayaks.

2007 - 2008
• The water shut off was repaired and is working.
• Norm and Ron Shaw replaced the water heater in August 2008.
• Trees down and firewood (Craig Shaw, Sandi and Ric Twigg) October 2007.
• Snow coat roof (Ron Shaw and Leonard Shaw) October 2007.
• New toilet (Howard and Donna) July 2007.


 


© 2007-2011 Melissa Shaw Jones. All Rights Reserved.